We use cookies to ensure that we give you the best experience on our website. If you click 'Accept all cookies' we'll assume that you are happy to receive all cookies and you won't see this message again. If you click 'Reject all non-essential cookies' only necessary cookies providing core functionality such as security, network management, and accessibility will be enabled. Click 'Find out more' for information on how to change your cookie settings.

Overconstrained assemblies such as aircraft sub-assemblies present a challenge to production planners, as variations in parts and processes can make it difficult to achieve all assembly Key Characteristics (KCs) simultaneously. Despite assigning tight tolerances to sub-component manufacture, part variation propagation necessitates expensive and time-consuming variation management processes such as shimming in order to ensure the final assembly is within specification. This paper presents for the first time a variation propagation model for overconstrained assemblies, and develops a novel modelling method to connect variations with production costs. This facilitates a novel process optimisation method based on variation propagation, with the ability to analyse the trade-offs between the cost and achievable variation limits of the entire manufacturing chain in order to minimise the overall manufacturing cost. An overconstrained wing spar assembly is used as a case study to validate the methodology.

Original publication

DOI

10.1016/j.rcim.2018.12.009

Type

Journal article

Journal

Robotics and Computer-Integrated Manufacturing

Publication Date

01/06/2019

Volume

57

Pages

435 - 451